
Shrine
Tamasudare
Hakone•950m(12 min walk)
小田急箱根鉄道線Hakone, Kanagawa
At a Glance
The mountain section opened in 1919, with Switzerland's Bernina Railway as its model, and the two railways became sister lines in 1979. Construction had to spare the natural scenery, so the track hugs the hillside in tight curves. In 2007 the line was named a civil engineering heritage site as Japan's steepest adhesion railway.
Temples, shrines and castles near Hakone Tozan Railway that give goshuin, closest first.
90 minutes
Be the first to review Hakone Tozan Railway
Share how your visit was to help other travelers.